空壓機(Ji)長期停放注(Zhu)意事項
2018-11-23 10:17:34      點擊:
空壓機(Ji)的停用在各個單[Dan]位[Wei]都常有發[Fa]生。那麼在[Zai]初次[Ci]開機前空[Kong]壓機[Ji]停放時[Shi]間超過三個(Ge)月或空[Kong]壓機停用時間超(Chao)過三個月,再[Zai]次(Ci)開[Kai]機前需要采取有[You]效措施,bi須先請(Qing)專業空壓機人員對(Dui)機器(Qi)進行保養檢測(Ce),制定安全措施,避免開機後發生(Sheng)不良狀況。

The shutdown of air compressors often occurs in various units. Then, before the first start-up, the air compressor parking time is more than three months or the air compressor parking time is more than three months. Before the second start-up, effective measures need to be taken. The Bi must first ask professional air compressor personnel to carry out maintenance and inspection of the machine, and formulate safety measures to avoid adverse conditions after the start-up.



1、先[Xian]檢查電路狀态,是否正常供(Gong)電,電壓是否穩定;測量電動機(Ji)絕[Jue]緣電阻,數值大[Da]于1MΩ。

1. Check the state of the circuit first, whether the power supply is normal, whether the voltage is stable; Measure the insulation resistance of the motor, the value is greater than 1M.



2、檢(Jian)查空壓機配件上是(Shi)否含有積水,灰塵,及(Ji)時清理(Li)。

2. Check whether there is water and dust on the spare parts of air compressor, and clean them up in time.



3、對進氣口,出(Chu)氣口全面[Mian]檢測,防止(Zhi)發生(Sheng)堵塞現象

3. Overall inspection of intake and outlet to prevent blockage



4、在上述都已經完成的情況可以接通電(Dian)源,查看電(Dian)腦控制器是否[Fou]正常運行

4. If all the above have been completed, the power supply can be connected to check whether the computer controller is working properly.



5、更[Geng]換三濾(Lü)和潤滑油。因為在長(Zhang)期不用的情況下,三濾(Lü),油可能發生[Sheng]老化(Hua)現象,從而造成空壓(Ya)機開機運行(Hang)時間不(Bu)長即(Ji)結膠積碳或堵塞,油路不(Bu)暢使空壓機主機[Ji]或其他零部[Bu]件損壞。

5. Replace three filters and lubricants. Because in the case of long-term non-use, three filters may cause oil aging phenomenon, which causes the air compressor start-up time is not long, that is, cementing carbon deposit or blockage, oil circuit is not smooth, so that air compressor main engine or other parts are damaged.



6、專業人員試[Shi]機,電路改[Gai]造後人工(Gong)控制加載卸載,先[Xian]空(Kong)載運行10分鐘以上,檢測各項指[Zhi]标和[He]震動、噪音(Yin)等正(Zheng)常,再進行(Hang)加載,查[Cha]看各部件運(Yun)行正常即(Ji)可。

6. Professional personnel test machine, after circuit modification, manual control loading and unloading, first no-load operation for more than 10 minutes, detection of various indicators and vibration, noise and other normal, then load, check the normal operation of the components.